Steamboat & Pearl Lake State Parks - June 2008 - Steamboat, CO
MPB Spraying of 417 Trees

Eagle County, CO - June 2008 - West Vail, CO
Helicopter Landing Site Slash Pile Cleanup and chipping.
Equipment included ASV Posi Track RC 100 with grapple Rake and Vermeer 1800 (19") Chipper
Worked in collaboration with Cecil Logging on portion of project.

Eagles Nest Subdivision - June 2008 - Silverthorne, CO
Working with Homeowner Volunteers
Chipping of slash (6" chipper), chips to remain on site for future use of Home Owners and common areas of HOA

Johnson Residence - July 2008 - Blue River, CO
Climb, limb, and fall in small pieces - 10 trees on property. Had to safe guard residence, power lines, septic filed, and new driveway
Climbing provided by Tree Works as subcontractor to Environmental Forestry Services, LLC
Chip slash and spread on surrounding property
Cut into firewood lengths and given away (we delivered by dump truck free of charge) to those in need of wood

Sts. John Condos - July 2008 - Keystone, CO
Hand fall 36 trees , limb and cut into six foot lengths, and stack on steep hill behind complex

USFS Straight 08 Sale approximately 11 acres - July 2008 - Dillon, CO
Working as Contractor for Greenlands Reserve Environmental Group who bought the sale.
Work included meeting requirements of USFS Contract and performing environmental tasks assigned by Greenlands Reserve for erosion and sediment control from I-70 runoff to protect water quality for Straight Creek. Used compact skid steers with sheers, grapples, and processor head instead of larger logging equipment to preserve as many live trees as possible for future regeneration. Also had to work around and within power line right of way running through entire project and keep Straight Creek Recreation Trail open to the public. TW Forest provided logging equipment and operation as subcontractor to Environmental Forestry Services, LLC. Town of Dillon Public Works Department donated necessary pit run, dump trucks, and front end loader to cover high pressure gas line that had to be crossed many times through out project. This project was quite a collaborative effort of many to accomplish the needs of the USFS and Greenlands Reserve. Tree count is averaging 400-800 trees per acre

Three Peaks Subdivision - August, 2008 - Silverthorne, CO
MPB dead tree removal on several lots (all had to be hand felled, wedged, and line pulled to keep trees within property lines, slash crushing and dispersement on lots for erosion control as some properties were 40-45 % slopes, additional grass seeding in open areas, log removal to mill. Equipment included use of steel tracked skid steers with grapple rakes and skidding winches, choker cables and small excavator mounted processing head. All work could not have been completed with out the complete cooperation and efforts of members of the Three Peaks HOA volunteers charged with the the coordination of all work within the subdivision. Also Town of Silverthorne's complete cooperation to keep their designated slash disposal site open later into the season for disposal of chips and slash!!

Elk Haven Subdivision - August, 2008 - Silverthorne, CO
MPB dead tree falling, skidding, processing, disposal of slash, and gave firewood away to those in need.
Hand falling, skid steer skidding, using excavator mounted processing head, and small excavator with bucket and thumb for loading slash onto dump trucks for removal from site.

Rocking "A" Ranch - August/September 2008 - Silverthorne, CO
Slash pile chipping and spreading of chips onsite for erosion and landscape needs.
Vermeer 1800 (19") chipper, one steel tracked and one rubber tracked skid steer for use in breaking up very large piles of slash and spreading chips with bucket around property